
Whole-house renovation
Full Property Renovation
Beverley, East Yorkshire
Location
Beverley, East Yorkshire
Project type
Whole-house renovation
Duration
18 weeks
Completed
Recent project
Complete renovation of a family home, including internal remodelling, new kitchen, rewiring coordination and full redecoration.
What the client wanted.
A dated property bought with the intention of renovating it fully before moving in. The layout was closed off and the services were at the end of their life.
How we delivered it.
Internal walls were removed to engineer's design, the property was rewired and replumbed by our coordinated trades, and the whole house was replastered before joinery, kitchen installation and finishing.
The finished project.
A fully refurbished home handed over in one programme, with a single point of contact throughout rather than separate trades booked individually.
Drag to compare.
The same view of the property before work started and on completion.


Through the build.



Planning something similar?
Tell us about the project and we'll arrange a site visit.


